Lock work to halt river shipping

An overhaul of the Columbia-Snake navigation system will mean a 13-week shutdown.

VICKI HILLHOUSE
WALLA WALLA UNION-BULLETIN

WALLA WALLA -- The floating freight system that carries millions of dollars in grain and steel out of Walla Walla each year will be shut down for three months in a massive overhaul of the Columbia-Snake River navigation system.

The U.S. Army Corps of Engineers plans to shut down the river to transportation as part of a 13-week, $13.2 million replacement of the Lower Monumental Dam navigation lock.

The closure is part of a larger $46 million repair of the navigation system that stretches from Vancouver, Wash., to Lewiston, Idaho -- a major conduit in the Pacific Northwest transportation network.


» Read the Full Story (Subscribe)
If you are a print or online subscriber, please log in to read the full version of the story. If you are not a subscriber and would like to read the full version, sign up for a print or online subscription.


Commentsicon2
Log in or Subscribe to leave a comment.

Readers are encouraged to use these forums to discuss issues affecting the Walla Walla Valley. Comment writers should refrain from personal attacks and offensive remarks, and comments should be free of any personally identifiable information, such as e-mail addresses, mailing addresses and phone numbers. If you believe a comment is inappropriate, you can bring it to our attention by clicking the "report violation" link by the comment.

Registered User?